Avoid costly downtime. Learn how to select the right commercial asphalt crack filling machine for maximum daily output and DOT compliance.
The right equipment depends on what the patching crew has available before the first repair. If approved hot mix is ready at a plant or depot, a truck-mounted asphalt hot box can keep the material workable while the crew moves between stops.
Two loads of asphalt millings can look similar from the loader cab and take different amounts of time to process. A batch that contains more water needs more heat to remove that water before the mix is ready for its next check.
A pothole crew needs more than a total tonnage figure. It needs enough hot mix for the scheduled stops, a vehicle that can carry the load, and a supply plan that still works when a patch turns out deeper than expected.