| Availability: | |
|---|---|
| Quantity: | |
FND-ZG350
1. Low-profile trailer-type design to reduce operators’ workload Adopts yacht-grade trailer rear axle to lower overall machine height. Low-level feeding port with splash-proof plate enables easy feeding and prevents scald injuries. Trailer-mounted for fast site transfer and higher construction efficiency.
2. Japan Omron dual digital temperature control to avoid material waste Imported dual-digital LCD temperature controller displays temperature of thermal oil, sealant and hose precisely in real-time. Indirect thermal-oil constant-temperature heating prevents asphalt sealant from burning and scrapping.
3. Electric control switch on filling gun to cut sealant consumption Handle-mounted electric switch remotely controls the material pump for instant start-stop. It avoids overflow and dripping, saves sealant and lowers project material cost.
4. 45° angled combustion chamber for high heat efficiency & fuel saving Flame blows at 45° onto chamber wall instead of direct heating on melting kettle for full combustion and lower fuel consumption. The 6-meter 270° flexible anti-bending heating hose adapts to both horizontal and vertical cracks for wide coverage.
5. Imported variable-speed electric mixer for easy maintenance & reliability Imported variable-speed mixing motor ensures even melting with simple structure for easy servicing. Integrated unit fits crack repair for highways, county roads and airport pavements.
Model | FND-TG350 ( Trailer) | FND-ZG350 ( Self-propelled ) | FND-CG350 ( Vehicle-mounted ) |
Dimensions(MM) | 3100 X 1640 X 1960 L*W*H | 3100 X 1640 X 1960 L*W*H | 2400 X 1200 X 1500 L*W*H |
Net Weight | 1600 KG | 1300 KG | 1000 |
Generator | Honda gasoline | Honda gasoline | Honda gasoline |
Melter Capacity | 350 L | 350 L | 350 L |
Diesel Capacity | 62 L | 62 L | 62 L |
Heat Transfer Fluid Capacity | 80 L | 80 L | 80L |
Feeding Pump | Flow 2m3/h, pressure 0.16Pa | Flow 2m3/h, pressure 0.16Pa | Flow 2m3/h, pressure 0.16Pa |
Diesel Combustor | American, 105000 - 350000 Btu/h | American, 105000 - 350000 Btu/h | American, 105000 - 350000 Btu/h |
Thermocouple | Import K type | Import K type | Import K type |
LCD Temperature Control | Import from Janpan | Import from Janpan | Import from Janpan |
Self-loading machine | Crack router | - | - |
Lift hoist | 12V / DC, 300 W, lifting tension 650 KG | - | - |

As the level of road maintenance increases, traffic volume increases significantly, and material prices rise, a large amount of maintenance costs are spent on the road surface. Therefore, road maintenance occupies an important position. The maintenance work varies depending on the type of road surface: for low-level gravel and crushed stone road surfaces, it mainly involves maintaining smoothness and road arches, scraping the wear layer, and supplementing materials; For low-grade asphalt pavement such as asphalt surface treatment, the main methods are pit filling, covering, and re mixing or re paving of loose materials; For advanced road surfaces such as asphalt concrete roads, there are excavation and repair of potholes and cracks, surface sealing and anti slip measures, etc; Cement concrete pavement mainly involves filling and sealing joints, filling and compacting voids at the bottom of the slab, and replacing local slabs. The characteristics of road maintenance work are small and scattered, so the processing and handling of required materials should be easy to obtain, the construction tools should be small and flexible, preferably one machine for multiple uses, the noise should be low, the construction method should be fast and safe without affecting or minimally affecting traffic, the construction signs should be clear day and night, and the protection should be thoughtful to avoid traffic accidents.
1.Are you road maintenance machine factory or trading company?
We are a professional direct factory focusing on road maintenance machinery. All of our 1m³ snow melting spreaders are independently produced in our factory. We can provide factory competitive prices, stable quality control and support OEM customized service.
2. Do you supply spare parts for long‑term after‑sales?
Yes, we provide permanent long-term spare parts supply for our 1m³ de-icing spreader. All wearing parts and core components are always in stock to support your local after-sales maintenance for many years.
3. What discount for full container FCL order?
We support good quantity discount for FCL full container orders. The more quantity you order, the more favorable the price. We will provide you with the best exclusive FCL quotation according to your actual order quantity.
Warranty
The equipment warranty period is 12 months, calculated from the date of equipment ex-factory. For product quality defects, the Supplier shall provide maintenance guidance via telephone; on-site service is not included under warranty. Should on-site service be required, it shall be subject to mutual negotiation between both parties, and the Buyer shall bear all relevant travel and accommodation expenses. For component-related quality failures occurring within the warranty period, free repair or replacement shall be available upon mutual agreement with the Supplier. Wear-and-tear parts are excluded from this warranty.